UNQ204457 Revo Nunawading
Son Bültenler
  • 23rd Temmuz 2025, UNITA SITES: NATIONAL ALERT ON INCIDENTS. ATTENTION ALL SUB/Cs & UNITA SITE STAFF.

    PLEASE SHOW CAUTION WITH ALL WORKS & PROCESSES.
    INCIDENTS ARE ON THE RISE THIS MONTH ON UNITA SITES.

    Please check tags on all of your electrical equipment DAILY.
    Please ensure ALL documents on Hammer-Tech are SIGNED.
    Please remove non-compliant ladders off site IMMEDIATELY.
    Please show extreme caution with all tasks on DEMOLITION.
    Please SLOW DOWN ON SITE and continue works SAFELY.

    We all need a RE-SET on the pace of work to avoid incidents.

    If you don't feel safe on site you MUST report to Management.

    PLEASE CALL GRANT ON 0499 400 343 WITH ANY CONCERNS.

  • 31st Mart 2025, SWEARING VOLUMES ON SITE?? .... REMEMBER where you are ....

    .TO ALL NATIONAL UNITA SITES.
    ATTENTION Workers & Visitors:
    Please show mindful consideration and respect to site personnel, general public, and all client staff, regarding volume of radios, swearing profanities, and inappropriate discussions on UNITA Sites.
    Reports have been made of foul language and conversations being heard thru shopping centre hoardings, and around various site areas.
    Yelling vulgar language over high radio volumes has been reported as a serious issue, and shall result in radios banned from site as well as the personnel caught offending being red-flagged from UNITA projects permanently.
    YOU HAVE BEEN WARNED.

    Ekler :
    Swearing Warning..png
  • 20th Mart 2025, Revo Nunawading - Drawing Update: Issue for Construction

    We have received the IFC (Issued for Construction) drawings for the Nunawading Project. Please download and review the documents to ensure any changes are captured. Based on our review and what we have been advised, there are no changes from IFT (Issued for Tender) to IFC.

    The most current programme has also been included in the shared folder for your reference.

    Additionally, the drawings have been updated accordingly on HammerTech.

    Shared Folder Link: 00. Revo Nunawading_Shared Drawings Folder

    If you identify any discrepancies or require clarification or cannot access the drawings let me know as soon as possible, please.

Saha Hava Durumu Tahmini
Geçerli Saha Hava Durumu

Son Güncelleme Saati: 00:21
Sıcaklık: 13C (App 10C)
Rüzgar Hızı: 11KMH
Maks. Rüzgar: 11KMH @00:21
Saat 9'dan beri yağmurlu: 0,0mm
Min Sıcaklık: 13C @00:20
Maks Sıcaklık: 21C @12:17 14.12.2025
Bora: 13KMH
Maks Bora: 13KMH @00:21


Gözlem kaynağı - Bureau of Meteorology
Gözlem Konumu - Melbourne (Olympic Park), VICTORIA
Zaman Dilimi - Doğu Avustralya Standart Saati
Tahmin - Pazartesi, 15 Aralık

Partly cloudy.
Min: 11C Maks: 21C
Yağmur İhtimali: 5%


Tahmin kaynağı - Bureau of Meteorology
Tahmin Konumu - Melbourne, VICTORIA
Zaman Dilimi - Doğu Avustralya Standart Saati
Yarın - Salı, 16 Aralık

Sunny.
Min: 11C Maks: 33C
Yağmur İhtimali: 0%


Önemli Saha Belgeleri
Sahada Yeni misiniz?

Bu sahanın KKD Gereksinimlerini biliyor musunuz?

Sahadaki ilk gününüzde doğru güvenlik ekipmanlarına sahip olduğunuzdan emin olun.

Saha KKD Gereksinimlerini Görüntüle

Sahaya geldiğinizde kısa süre içinde çalışmaya başlamak için hazırlanın.

Saha kaydınızı çevrimiçi tamamlayın ve zamandan kazanın.

Kayda Başla

Sahada Yeni misiniz?

Bu sahanın KKD Gereksinimlerini biliyor musunuz?

Sahadaki ilk gününüzde doğru güvenlik ekipmanlarına sahip olduğunuzdan emin olun.

Saha KKD Gereksinimlerini Görüntüle

Sahada Yeni misiniz?

Sahaya geldiğinizde kısa süre içinde çalışmaya başlamak için hazırlanın.

Saha kaydınızı çevrimiçi tamamlayın ve zamandan kazanın.

Kayda Başla