UNQ204457 Revo Nunawading
Últimos Boletines
  • 23rd julio 2025, UNITA SITES: NATIONAL ALERT ON INCIDENTS. ATTENTION ALL SUB/Cs & UNITA SITE STAFF.

    PLEASE SHOW CAUTION WITH ALL WORKS & PROCESSES.
    INCIDENTS ARE ON THE RISE THIS MONTH ON UNITA SITES.

    Please check tags on all of your electrical equipment DAILY.
    Please ensure ALL documents on Hammer-Tech are SIGNED.
    Please remove non-compliant ladders off site IMMEDIATELY.
    Please show extreme caution with all tasks on DEMOLITION.
    Please SLOW DOWN ON SITE and continue works SAFELY.

    We all need a RE-SET on the pace of work to avoid incidents.

    If you don't feel safe on site you MUST report to Management.

    PLEASE CALL GRANT ON 0499 400 343 WITH ANY CONCERNS.

  • 31st marzo 2025, SWEARING VOLUMES ON SITE?? .... REMEMBER where you are ....

    .TO ALL NATIONAL UNITA SITES.
    ATTENTION Workers & Visitors:
    Please show mindful consideration and respect to site personnel, general public, and all client staff, regarding volume of radios, swearing profanities, and inappropriate discussions on UNITA Sites.
    Reports have been made of foul language and conversations being heard thru shopping centre hoardings, and around various site areas.
    Yelling vulgar language over high radio volumes has been reported as a serious issue, and shall result in radios banned from site as well as the personnel caught offending being red-flagged from UNITA projects permanently.
    YOU HAVE BEEN WARNED.

    Archivos adjuntos :
    Swearing Warning..png
  • 20th marzo 2025, Revo Nunawading - Drawing Update: Issue for Construction

    We have received the IFC (Issued for Construction) drawings for the Nunawading Project. Please download and review the documents to ensure any changes are captured. Based on our review and what we have been advised, there are no changes from IFT (Issued for Tender) to IFC.

    The most current programme has also been included in the shared folder for your reference.

    Additionally, the drawings have been updated accordingly on HammerTech.

    Shared Folder Link: 00. Revo Nunawading_Shared Drawings Folder

    If you identify any discrepancies or require clarification or cannot access the drawings let me know as soon as possible, please.

Pronóstico del tiempo para la Obra
Tiempo en Obra actual

Última actualización el: 12:21 AM
Temperatura: 13C (Aplicación 10C)
Velocidad del viento: 11MPH
Máx. Viento: 11MPH @12:21 AM
Lluvia desde las 9 a.m.: 0.0mm
Temp mín: 13C @12:20 AM
Temp máx: 21C @12:17 PM 12/14/2025
Ráfaga: 13MPH
Ráfagas máx: 13MPH @12:21 AM


Observación obtenida de - Bureau of Meteorology
Lugar de observación - Melbourne (Olympic Park), VICTORIA
Zona horaria - hora estándar de Australia oriental
Pronóstico - lunes, 15 diciembre

Partly cloudy.
Mín: 11C Máx: 21C
Probabilidad de lluvia: 5%


Pronóstico obtenido de - Bureau of Meteorology
Lugar de la previsión - Melbourne, VICTORIA
Zona horaria - hora estándar de Australia oriental
Mañana - martes, 16 diciembre

Sunny.
Mín: 11C Máx: 33C
Probabilidad de lluvia: 0%


Documentos importantes de la Obra
¿Primera vez en la Obra?

¿Conoce los requisitos de PPE para esta Obra?

Asegúrese de que cuento con el equipo de seguridad correcto para su primer día en la obra.

Ver los requisitos de PPE para la Obra

Empiece a trabajar en cuanto llegue a la obra.

Complete su registro de la obra en línea a su conveniencia y ahorre tiempo.

Comenzar registro

¿Primera vez en la Obra?

¿Conoce los requisitos de PPE para esta Obra?

Asegúrese de que cuento con el equipo de seguridad correcto para su primer día en la obra.

Ver los requisitos de PPE para la Obra

¿Primera vez en la Obra?

Empiece a trabajar en cuanto llegue a la obra.

Complete su registro de la obra en línea a su conveniencia y ahorre tiempo.

Comenzar registro